This install checklist is for machine-tool part fitting, base checks, shaft alignment, and first start procedure in South African workshops. It helps the fitter record what was inspected before bolts are tightened and power is applied.

How Install Checklist helps on a working week

Install Checklist covers the workshop checks that matter before a part is fitted or a machine is started. It includes alignment points, mounting checks, and start-up steps that help the job move in the right order on site.

Begin the checklist with the machine model, the work order, and the conditions at the site. Highveld dust can contaminate open slideways, while coastal humidity can mark bare metal and affect stored components. Power cuts, trip conditions, and travel between Randburg, Johannesburg, Durban, Cape Town, and other South African workshops should be recorded before fitting dates are set.

Take photos before covers are removed and before old parts are stripped out. Include mounting faces, cable routing, guard positions, oil leaks, and any wear marks around the failed area. A complete visual record makes it easier to spot whether the fault came from misalignment, looseness, contamination, or previous repair work.

Checks before first power-up

The completed sheet should show mounting condition, fastener status, alignment readings, lubrication points, and the order of the first run. Notes must identify any backlash, bearing noise, cracked covers, or damaged wiring found during fitting. That gives the workshop a usable record for the machine rather than a vague handover note.

Link the checklist to the matching rebuild record and parts paperwork before extra repair work is added to the job. Confirm the machine reference and fitted component against the file before anything is sent. If further faults are found during fitment, list each one separately with its position on the machine.

  • Machine identity recorded before stripping
  • Mounting faces checked for burrs
  • Photos attached to the job file

Workshop conditions that affect fitment

Older machines often arrive with substituted bolts, non-standard shims, added switches, or previous weld repairs. Put those changes on the checklist before the new part goes in, especially where they can affect centre height, guard clearance, or travel limits. Keep urgent failure items separate from wider rebuild work so the install record stays clear.

Coastal sites need closer attention to rust on bare metal, electrical terminals, and stored spares. Inland workshops commonly deal with grinding dust, dry slides, and dirt entering cabinets when doors are left open. Power interruptions can break a test cycle, so note at what stage the machine stopped and which settings were being checked.

Operated by Astros Marketing (Pty) Ltd from 2 Makro Place, Sunnyrock 1401.

Fitting notes worth keeping

Complete the install checklist with machine photos, site dates, and any worn or failed items found before fitting starts. Keep the email subject line specific to the machine and job.

Complete the checklist on the day of installation while readings, photos, and part numbers are still at hand. File it with the job card, spares list, and any email trail used for approval or fault reporting. That makes later service work easier when the same machine returns for adjustment or another component change.